QUI Cutter
"The expansive-stress of the Qui Cutter will exceed the initial strength of concrete after a few days of pouring. This makes it perfect for pile head breaking."
Pile Cropping
Our Qui Cutter generates cracks in concrete, making it the perfect solution for pile cropping. The Qui Cutter reacts with excess water within the concrete, causing gradual expansive stress and generating cracks to allow pile cutting.
The breaking down of concrete piles and diaphragm walls are an essential part of the construction process. It is often given insufficient early thought in the planning of piling works. The adoption of a suitable pile breaking method such as Qui Cutter can save time and money and, most importantly, will address and reduce potential health and safety issues in relation to this phase of the work.
The Qui Cutter can be applied to the diaphragm wall and bored piles with diameters of 450mm to 3,000mm.
The breaking down of concrete piles and diaphragm walls are an essential part of the construction process. It is often given insufficient early thought in the planning of piling works. The adoption of a suitable pile breaking method such as Qui Cutter can save time and money and, most importantly, will address and reduce potential health and safety issues in relation to this phase of the work.
The Qui Cutter can be applied to the diaphragm wall and bored piles with diameters of 450mm to 3,000mm.
When enquiring about Qui Cutter, please provide the following details:
• Type of pile (e.g. Bored pile, CFA, diaphragm wall, etc.)
• Size of pile (e.g. 1200mm Dia)
• Number of piles
• Size and number of main bar (e.g. 24N36, L=1,200mm)
• Shape of main bar (e.g. Straight, cog, etc.)
• Trim/Breaking length (concrete finished level – design cut-off level)
Alternatively, you can send us the relevant drawings. Email us at [email protected].
• Type of pile (e.g. Bored pile, CFA, diaphragm wall, etc.)
• Size of pile (e.g. 1200mm Dia)
• Number of piles
• Size and number of main bar (e.g. 24N36, L=1,200mm)
• Shape of main bar (e.g. Straight, cog, etc.)
• Trim/Breaking length (concrete finished level – design cut-off level)
Alternatively, you can send us the relevant drawings. Email us at [email protected].